A light gauge steel subfloor is a raised floor platform made from cold-formed steel bearers and joists, carried on steel or concrete piers. It is the usual way to build a BRIbuild kit home on a sloping, sandy or reactive block, because the frame takes up the fall of the land instead of cutting and filling for a slab. Every BRIbuild kit includes either a steel subfloor or a footing design for a slab, with the engineering certified for your building permit.
Key takeaways
- A steel subfloor is engineered per design and per site: the layout sheets set the exact position and height of every post, bearer and joist.
- It suits sloping, sandy and reactive sites because the frame is levelled above the ground rather than poured onto it.
- Steel subfloors do not rot, warp or feed termites, and they fix steel-to-steel to the wall frames above.
- BRIbuild supplies subfloor steel from all six of its locations: Melbourne, Adelaide, Perth, Gold Coast, Brisbane and Bundaberg.
- The subfloor is part of the kit price; site works, concrete and installation labour are quoted locally.
What is a light gauge steel subfloor?
Light gauge steel (LGS) is thin, high-strength steel that is roll-formed into C- and Z-shaped sections. In a subfloor, those sections become bearers and joists that span between support points and carry the structural flooring sheets. BRIbuild roll-forms its frames from BlueScope TRUECORE steel and supplies each subfloor pre-cut and labelled to the engineering drawings, so the pieces land where the plans say they should.
The subfloor is the first steel to arrive on site, and everything above it depends on it being level and true. The wall frames are fixed straight through the floor into the subfloor below, so the whole structure is tied together from the piers up.
When does a steel subfloor make more sense than a slab?
A concrete slab is the simpler choice on a flat block with stable soil. A raised steel subfloor earns its place when the site is working against you:
- Sloping blocks. The frame takes up the fall, giving a flat platform without major cut and fill. On Stuart’s Stables kit home at Crafers in the Adelaide Hills, no two posts sit at the same height, yet the finished floor is dead level.
- Sandy or coastal ground. Keeping the home clear of the soil keeps it clear of moisture and sand movement. David’s owner-builder home at Venus Bay sits on concrete-free steel footings under a raised steel subfloor, so the sandy block was barely disturbed.
- Reactive or uncertain soil. Piers can be set to the depth the soil test calls for, which is harder to do with a slab.
- Sites with trees and boundaries to protect. Piers need far less excavation than a slab, so established trees and fences can stay where they are.
Your soil test and site survey decide this. Get both early: they determine the footing design and let your earthworks contractor quote properly.
How is a steel subfloor installed?
The sequence below is how Stuart’s build at Crafers went up. The method is the same on most sloping sites.
- Prepare the pad. On a hill block the building platform is cut and benched into the slope, compacted, and the house outline marked with profile pegs. Getting a clean, level base is half the job.
- Set out and drill the piers. Each pier hole is positioned straight off the subfloor layout sheets in the engineering plans, then augered to the engineered depth.
- Stand the posts and build the frame on props. The galvanised posts are stood in the open holes and the bearer-and-joist frame is built over them on adjustable props. Nothing is concreted yet.
- Level everything first. Each post is cut to height on site and the whole frame is brought to dead level across the footprint. Only once everything checks true is the level locked in.
- Concrete the piers. Concrete goes straight into the footing holes around the posts, making the level permanent. On a cut, uneven site a line pump saves barrowing the mix.
- Sheet the floor and stand the walls. With the subfloor on its piers, the structural flooring goes down, and the wall frames are stood, braced and fixed through the floor into the steel below. At Crafers the subfloor, walls and roof trusses were all standing within a week of the frames arriving.
Venus Bay followed the same logic with a different footing: concrete-free steel footings, which suited the sandy ground and removed the concrete pour altogether. The footing system is chosen for the site; the subfloor above it works the same way.
What does a steel subfloor cost?
The subfloor itself is included in your kit price, along with the footing engineering. What you pay for locally is the site preparation, the pier holes and concrete, and the labour to stand and level the frame. Those costs depend on the slope of the block, the soil test, access for equipment, and whether the pad needs cutting. The steel frame kit home cost guide sets out which parts of the build are in the kit and which are quoted locally.
Because the subfloor is engineered to your design, two homes with the same floor area can need different amounts of steel: spans, the fall across the site and the wind classification all change the member sizes and the number of piers.
Why steel rather than timber under the floor?
- Steel does not shrink, warp or twist, so the floor stays flat and quiet over time.
- It is not a food source for termites, and it is non-combustible.
- Members arrive pre-cut and labelled to the engineering, which suits owner-builders and small crews.
- Steel-to-steel fixing from the piers through the floor to the wall frames gives a continuous load path for bracing and tie-down.
Timber is lighter to handle piece by piece and more familiar to some trades. If your builder has not worked with steel before, the labelled layout sheets are the thing to show them first.
What to decide before you order
- Soil test and site survey. These set the footing depth and the pier layout. Order them before the design is finalised.
- Slab or subfloor. Flat and stable usually means slab; sloping, sandy or reactive usually means subfloor.
- Footing type. Concreted piers or concrete-free steel footings, chosen with your engineer for the soil.
- Access. Can a truck and a crane or forklift reach the pad? This affects the delivery quote and unloading.
- Who stands it. An owner-builder with a small crew, or your builder. Either way, the subfloor is levelled on props before any concrete goes in.
Current designs and their published kit prices are on Kit Home Floor Plans.
Frequently asked questions
Can I build a steel subfloor on a sloping block?
Yes. This is where it works best. The posts are cut to height on site so the floor is level above a sloping pad, as on Stuart’s build at Crafers.
Does the kit include the subfloor?
Yes. A BRIbuild kit includes the steel subfloor, or the footing design if you are building on a slab, with the engineering certification for your permit. Delivery, site works, concrete and installation labour are quoted separately.
Where is the subfloor steel supplied from?
From the BRIbuild location nearest to you: Melbourne, Adelaide, Perth, Gold Coast, Brisbane or Bundaberg. Stuart’s subfloor steel at Crafers came direct from the Adelaide facility.
Do the piers have to be concreted?
Not always. Concreted galvanised posts are the usual choice; on some sites, such as David’s sandy block at Venus Bay, concrete-free steel footings are used instead. Your engineer decides based on the soil test.
Can an owner-builder install a steel subfloor?
Many do. The members arrive pre-cut and labelled to layout sheets, and the frame is levelled on adjustable props before the piers are concreted. Your building surveyor will inspect the footings and frame at the stages your permit requires.
Planning a build on a difficult block? Call 1300 866 131 or email info@bribuild.com.au and we can look at the site with you.