Stuart’s Stables Kit Home — Crafers, SA

Project facts

StatusUnder construction (wall frames and roof trusses delivered)
LocationCrafers, Adelaide Hills, SA
DesignBRIbuild Stables kit home (set material template)
SiteSloping block, building pad cut and benched into the hillside; car shed planned at the rear
Build teamStuart, with builder friend Darren
FoundationsInline steel subfloor on 90×90 SHS galvanised posts in augered piers, levelled on adjustable props before concreting
FrameLight gauge steel wall frames and roof trusses, delivered labelled in build order; subfloor steel supplied from BRIbuild's Adelaide facility
RelatedAdjustable footings

The Block

Rural build site for Stuart's Stables kit home at Crafers in the Adelaide Hills, South Australia — open pasture sloping down to native bushland across the valley
The Crafers block before construction — the Adelaide Hills outlook the finished Stables home will look out over.

The Stables kit home journey starts here. This is the first photo Stuart sent us of his block at Crafers, in the South Australian Adelaide Hills — open pasture rolling down to native bush across the valley, with his dog Ceaser out surveying the ground where the home will go. We'll follow this build from bare site through to handover.

Cutting & Benching the Building Pad

Site cut for a kit home build at Crafers, South Australia — building platform benched into the slope with profile pegs set out
The building platform cut and benched into the slope, with profile pegs marking out the house outline.

Before any steel arrives, the building platform is cut into the slope. With an existing access road already in place and a car shed to be built at the rear, the level of the house had to be dropped down — so the pad was cut and benched into the Crafers hillside to sit right with both. The profile pegs mark out the building outline, ready for the subfloor posts to go in.

Levelled building pad cut into the Adelaide Hills slope at Crafers, dropped down to suit the access road and rear car shed
The finished site cut — the pad dropped down to work in with the access road and the car shed planned at the rear.
Levelled kit home building pad at Crafers, South Australia at dusk, cut into the Adelaide Hills slope with the valley beyond
The finished pad at dusk — cut level into the Adelaide Hills slope, ready for the build.

Preparing the Access Road

Tip truck delivering crushed road base to prepare the access road at the Crafers kit home build site, South Australia
Crushed rock delivered to prepare and surface the site access road.
Compacted crushed-rock subfloor pad on Stuart's sloping Crafers block, looking out over the paddocks
The finished, compacted subfloor pad looking out over the block at Crafers in the Adelaide Hills. Getting a sloping site to this point — a clean, level base ready for the steel — is half the job on a hill block.

Subfloor Steel Delivered

Apex crane truck delivering galvanised steel subfloor materials to a kit home build at Crafers, South Australia
The first delivery reaches the Crafers block — subfloor steel supplied direct from our Adelaide facility.

With the block prepped, the first materials arrive on site. Because Stuart's Stables uses a set material template, the subfloor steel is supplied locally and directly from our Adelaide facility — a short, direct run into the South Australian Adelaide Hills. This build uses an inline subfloor system that sits on 90×90 SHS galvanised posts concreted into the ground, giving a level, durable platform on the sloping Crafers site.

Flatbed crane truck loaded with bundled galvanised steel subfloor sections on the Crafers build site
Bundles of galvanised steel subfloor sections on site, strapped and ready to unload.
Galvanised 90x90 SHS posts and steel subfloor bearers unloaded on site for an inline subfloor system at Crafers, South Australia
Crane-unloading the 90×90 SHS posts and galvanised bearers beside the pad — the inline subfloor system begins.

Drilling the Subfloor Piers

Mini excavator with an auger attachment drilling subfloor pier holes at the Crafers kit home site in the Adelaide Hills, South Australia, on the levelled pad set out from the engineering layout sheets
Setting out and drilling the subfloor pier holes — positions taken straight off the subfloor layout sheets in the engineering plans.

With the pad prepped and the subfloor steel on site, the next step is setting out and drilling the footings. Every pier hole is positioned straight off the subfloor layout sheets in the engineering plans, so each post lands exactly where the design calls for it. Stuart and his builder mate Darren drilled all the holes themselves, using Stuart's own small excavator fitted with an auger. You don't need to own a machine for this stage, though — a day-hire digger, or most small earthmoving and landscaping outfits, can knock it over in a session. It's one of the parts of a kit home build that's well within reach of a capable owner-builder.

Auger boring a footing hole for a galvanised steel subfloor post at the Crafers kit home build in the Adelaide Hills, South Australia, with the owner-builder overseeing
Boring each footing hole with the auger — these take the 90×90 galvanised posts, which are then concreted in. Stuart's own mini digger did the work.
Grid of augered subfloor pier holes across the levelled pad at the Crafers kit home site, set out from the engineered subfloor layout, South Australia
The pier holes augered out across the pad, set to the engineered layout and ready for the subfloor posts to be stood and concreted.

Setting the Subfloor Level

Galvanised steel subfloor frame being assembled on adjustable props over posts set in open holes at the Crafers kit home site, South Australia, on a foggy morning
The subfloor frame going up over the posts on adjustable props, ready to be levelled — posts stood in the open holes, nothing concreted yet.

With the pier holes drilled, the subfloor comes together from the ground up. The 90×90 galvanised posts are stood in the open holes — but nothing is concreted yet. The steel subfloor frame is built up over them and carried on adjustable props, so every point can be lifted and fine-tuned before anything is locked in. Each post is cut to height on site, and the whole frame is then brought to dead level — which matters most on a block cut into a slope like Crafers, where no two posts sit at the same height. Darren, being a builder, shot the levels with a laser level. You don’t need a builder’s kit for it, though — a simple string level does the same job just as well for an owner-builder. Only once the frame is dead level and square do the posts get concreted in, so the finished floor level is set first and then made permanent

Elevated view of the galvanised steel subfloor footprint framed out on the levelled pad at Crafers in the Adelaide Hills, South Australia, in fog
The full house footprint framed out in galvanised steel, looking down over the foggy Adelaide Hills valley.
Galvanised perimeter subfloor beams levelled on adjustable steel props at the Crafers kit home build, South Australia
The galvanised perimeter beams set true and level on adjustable props before the posts are locked in.
Worker laying steel floor joists across the levelled subfloor frame at the Crafers kit home site, South Australia, with the Adelaide Hills valley behind
Floor joists laid in across the levelled beams — the inline subfloor grid taking shape on a clear day.
Completed level galvanised steel subfloor grid standing on posts with open footing holes at the Crafers kit home build, South Australia
The completed, dead-level subfloor grid standing on its posts — the holes still open, waiting to be concreted once everything checks true.
Close-up of a galvanised steel subfloor post set to height in an open augered footing hole before concreting at the Crafers kit home site, South Australia
A subfloor post stood in its open augered hole — set to height and held level, ready to be concreted in.

Concreting the Subfloor Piers

Format concrete pump filling the subfloor pier holes under Stuart's inline purlin steel subfloor frame at Crafers
A Format concrete pump feeding the subfloor pier holes at Crafers. The steel frame is already dead level on its props — the pour just makes it permanent.

With the inline purlin subfloor frame stood up on adjustable props and every post cut to height, the frame gets brought dead level across the whole footprint before a drop of concrete goes in. Only then does the concrete go down. A Format concrete pump runs the mix straight into each pier hole around the posts, locking the level in permanently — the level is set first on the props, then made permanent in concrete. Using a line pump like this saves barrowing wet concrete across a cut, uneven site and gets a clean pour into every footing.

Pouring concrete directly into footing holes at Stuart's Stables kit home in Crafers South Australia, wet concrete placed into excavated pier holes on the building site
Concrete goes straight into the footing holes at Crafers. Placing the piers that will carry the steel frame.

Concrete poured directly into the footing holes at Stuart's Stables in Crafers. Placing it straight into the excavated holes forms the piers that carry the steel structure above, a simple and solid way to found the build on this site.

Concrete footing holes being filled at Stuart's Stables kit home Crafers South Australia, freshly poured pier footings on the site
Filling the footing holes at Crafers. Each pier poured in place to set the foundation for the frame.

Working across the footing holes at Crafers, each one filled with concrete in place. These piers set the foundation grid the steel frame will land on.

Freshly poured concrete pier footings at Stuart's Stables kit home Crafers South Australia, foundation work on the building site
The pier footings take shape at Crafers. Foundations in and curing, ready for the steel to follow.

The pier footings are in at Crafers and left to cure. With the foundations set, the site is ready for the steel frame to go up next.

Light Gauge Steel Manufactured

Light gauge steel framing manufactured and stacked ready for delivery for Stuart's Stables kit home at Crafers South Australia
The light gauge steel is manufactured and ready for delivery to Crafers. Frames rolled and bundled ahead of the build.

The light gauge steel for Stuart's Stables is manufactured and ready for delivery to Crafers. Rolling and bundling the frames off-site means they arrive precise and ready to stand, which keeps the on-site build fast and accurate.

Bundles of manufactured light gauge steel framing ready for delivery for Stuart's Stables kit home Crafers South Australia
Steel bundled and ready to load for Crafers. Every frame made to measure before it leaves the factory.

The finished steel bundled and ready to load for the trip to Crafers. Made to measure in the factory, each frame is labelled and ordered so it goes up in sequence once it lands on site.

Wall Frames and Roof Trusses Delivered

Delivery of light gauge steel wall frames and trusses arriving on site at Stuart's Stables kit home Crafers South Australia
Delivery day at Crafers. The wall frames and trusses arrive on site ready to unload.

Delivery day at Stuart's Stables in Crafers. The light gauge steel wall frames and roof trusses arrive on site, bundled and labelled in build order so they can be unloaded and stood in sequence.

Steel wall frames being unloaded from the delivery truck at Stuart's Stables kit home Crafers South Australia
Unloading the frames at Crafers. A frontend loader makes light work of getting them off the truck.

Unloading the frames at Crafers. A tractor with a frontend loader is enough to lift the bundles off the truck, and where a site does not have that a crane truck can bring its own extension crane as part of the delivery.

Stacked steel roof trusses delivered on site at Stuart's Stables kit home Crafers South Australia
Trusses on the ground at Crafers. Everything on site to frame the roof.

The roof trusses laid out on site at Crafers. With frames and trusses both delivered, everything needed to stand the structure is now on the ground.

Delivered steel building materials laid out on site ready for assembly at Stuart's Stables kit home Crafers South Australia
Set out and ready at Crafers. The steel is on site and staged for the build to begin.

The delivered steel set out and staged at Crafers, ready for assembly. Having every frame and truss on site and in order means the build can move quickly once it starts.