Project facts
| Status | Lock-up |
|---|---|
| Location | Yea, VIC |
| Design | The Tobin, 3 bedroom single storey kit home |
| Build team | Ian and Julie, owner builders |
| Foundations | Waffle pod concrete slab |
| Frame | Light gauge steel wall frames and roof trusses, cut, punched and labelled in the factory for their position in the home |
| Walls | Sheathed and wrapped with insulation boards under dark external cladding |

Ian and Julie owner-built the Tobin, a 3 bedroom steel frame kit home in Yea. It starts with a waffle pod slab. The pods are laid out inside the formwork ready for reinforcement and the concrete pour.

Before anything was made, every stud, plate, brace and truss was modelled in 3D. These renders come straight from that frame model.

From above you can see how every truss lands on the wall frames below.

The concrete slab is poured and finished, giving a flat base for the steel wall frames.

Meanwhile the light gauge steel wall frames are made in the factory, cut, punched and labelled for their position in the home.

The finished frames are stacked and ready to go to site.

The frames are loaded onto the trailer for the trip to Yea.

The kit arrives on site the same day.

The frames are unloaded straight onto the slab, ready to stand up.

Two days after delivery the wall frames are going up and being fixed down to the slab.

With each frame labelled for its position, the walls go up quickly.

By the end of the weekend the frame of the home is taking shape.

From above, the full light gauge steel frame and roof trusses sit on the concrete slab, showing the layout of the home before any sheeting goes on.

Prefabricated steel wall frames arrive labelled and punched for services, so the frame goes up quickly and stays straight and true.

With the frame up, the walls are sheathed and the windows fitted, starting to close the home in.

Insulation boards go over the walls ahead of the cladding to lift the thermal performance of the home.

The full length of the home is wrapped and ready for the external cladding.

The roof is sheeted and the cladding starts going on from the bottom up.

With the dark cladding on and the roof complete, the Tobin is at lock-up.

From the front the farmhouse proportions of the Tobin come through, with the large openings ready for the alfresco and garage.

From the side the carport area tucks under the main roof line.

Inside, the painters are in. Straight steel studs make for flat walls and ceilings, which makes the finish easier to get right.